A new modern detached ADU in a backyard
ADU Builders · Sherman Oaks, CA

ADU Builders in Sherman Oaks - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

282+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee
Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansProudly serving local communities 20+ years
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A second-story addition that matches the existing roofline
A second-story addition with a balcony, matched to the original house
A single-story rear room addition with tall windows and a new patio
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Builders Across Sherman Oaks

Most detached ADUs in Sherman Oaks run between $180,000 and $320,000 before site work, and the biggest variable isn’t the structure itself. It’s the dirt underneath it. Sherman Oaks sits on a patchwork of expansive fill, especially as you climb toward the Santa Monica Mountains side of the neighborhood, and a soils report can change your footing depth, your slab spec, and your final number by $20,000 or more. We’re Sutton ADU Builders, and we’ve been building accessory dwelling units and room additions since 2006. If you’re weighing a JADU, a garage conversion, or a detached unit off Ventura Blvd or near the Galleria, call (472) 248-8213 and we’ll walk you through what your specific lot actually requires.

Call (472) 248-8213

Why Sutton ADU Builders Is Sherman Oaks’s Preferred ADU Builders Company

A small deck outside a new ADU

Homeowners here don’t want a vague estimate and an unfamiliar crew. They want a name, a face, and a number that doesn’t move. That’s the Threshold Standard, and it governs every project we take on in Sherman Oaks. Before any work begins, you receive a written price. Before anyone walks onto your property, you receive their photo, their name, and their background-check status. No exceptions.

We know the LADBS Valley office in Van Nuys is where your plans get checked. We know which Sherman Oaks lots trigger hillside grading review and which ones clear over-the-counter. That local fluency means fewer plan-check surprises and a realistic calendar from the start. Miles Hartwell leads our team, and he insists on one thing above all: the 365-Day Done Right Promise gets stamped on every project, in writing. If something isn’t right within a full year, we come back and fix it. No haggling, no fee.

Our ADU Builders crews serve Sherman Oaks directly, dispatched and scheduled from the brand’s Los Angeles office. Response to your first estimate call is typically same-day, and the written quote follows within days, not weeks.

JADU in Sherman Oaks

A JADU in Sherman Oaks is the fastest, least expensive way to add a legal second unit to your lot: it converts existing space inside your home or an attached garage into a self-contained unit under 500 square feet, with its own entrance and efficiency kitchen. On most Sherman Oaks RA/R1 lots, a JADU is allowed by right, which means no discretionary review and no lengthy public hearing. That’s the appeal.

What it costs is the question. A straightforward JADU conversion in Sherman Oaks typically runs $85,000 to $150,000, depending on whether you’re reworking an existing bedroom wing or converting an attached garage that needs insulation, electrical, and a new entry. Utility work drives the number: tapping into an existing panel versus adding a subpanel, extending sewer and water lines, and the condition of your existing framing. We give written line-item pricing before you sign, so the number stays the number.

What the conversion actually involves

A JADU isn’t just drywall and a door. We’re cutting a new exterior entry, upgrading egress windows, running a dedicated electrical circuit, and often scrapping old stucco for sound-rated wall assemblies. On 1950s ranch homes off Sepulveda or Van Nuys Blvd, we routinely find knob-and-tube remnants or undersized panels that need to come up to current code before LADBS signs off.

Permits and plan check

JADUs still go through LADBS Valley plan check in Van Nuys, but the review path is shorter than a full ADU. Figure two to four weeks for plan approval once drawings are submitted, assuming no hillside overlay applies to your lot. We pull permits, we pass inspections, and we don’t hand you the keys until the final sign-off is in hand.

ADU Plans in Sherman Oaks

The living room inside a new ADU

ADU Plans in Sherman Oaks are where most projects either succeed quietly or stall for months. A proper plan set isn’t just floor layouts. It’s site plans showing your setbacks (the required gap between your new structure and the property line), foundation details matched to your soils report, title-24 energy calculations, and structural drawings stamped by a California-licensed engineer. Sherman Oaks lots in the RA/R1 tract mostly require a 4-foot side and rear setback for detached ADUs, but hillside-adjacent parcels trigger a stricter slope review that a flat-lot builder might not anticipate.

Plan preparation and LADBS approval for an ADU in Sherman Oaks typically runs $8,000 to $18,000, including engineering, depending on lot complexity and whether grading review applies. That’s separate from construction. We handle the full plan set through our drafting partners, then shepherd it through LADBS Valley. You get a realistic timeline and a plan set that won’t get bounced back three times.

Site plan essentials

The site plan is the part that catches homeowners off guard. It has to show existing structures, the new ADU footprint, all setback dimensions, utility connection points, and any retaining walls or slope conditions. If your Sherman Oaks lot has even a mild grade change toward the rear, we document it early so plan check doesn’t send the set back with a grading note.

Why plan quality changes your final cost

A clean plan set moves through LADBS Valley faster and arrives at bidding with fewer ambiguities. That means fewer change orders later. We’ve seen homeowners try to save $4,000 on plans and lose $40,000 in mid-construction surprises. The plan set is where surprises get killed for $150 an hour instead of $15,000 a pop.

Trusted Brands We Service in Sherman Oaks

We install and finish ADUs from Abodu, Cover, and Dvele, and we’re equally comfortable with a panelized Mighty Buildings shell or a Plant Prefab unit. For Sherman Oaks homeowners, brand choice usually comes down to lot access and grade. A prefab shell needs a crane or flatbed path, and some rear yards off Dickens Street or Addison simply won’t fit one. We’ll tell you that before you buy. We also handle James Hardie cladding on every project where exterior finish matters, which in Sherman Oaks is most of them. Local stock for trim, flashing, and panel touch-ups is available through our usual supply lines, so a punch-list item doesn’t stall your final inspection.

Common ADU Builders Problems We See in Sherman Oaks Homes

  • Expansive fill beneath older slabs. Soils on the flats and the lower hillsides of Sherman Oaks can contain clay that swells when wet and shrinks when dry. A soils report that flags expansive material means deeper footings or a reinforced slab, and that changes both cost and schedule.
  • Hillside grading review delays. Lots on the Santa Monica Mountains side of Sherman Oaks, particularly around Mulholland-adjacent streets, often sit in a slope overlay that triggers separate grading review at LADBS Valley. This can add three to six weeks to plan check if not anticipated.
  • Rear-yard access for prefab delivery. A crane or flatbed needs a clear run to the build site. On narrow Sherman Oaks lots with mature street trees or overhead utility lines, access issues can turn a three-day panel set into a week-long problem.
  • Utility trenching surprises. Gas, sewer, and water lines on 1940s and 1950s Sherman Oaks tracts are often shallower or more convoluted than recorded plans suggest. We’ve uncovered lines five feet from where the city marked them. It’s expensive to fix mid-trench, and it’s avoidable with potholing before excavation.

Pricing for ADU Builders in Sherman Oaks, CA

A detached ADU in Sherman Oaks typically runs $180,000 to $320,000 all-in, before site work that your particular lot may require. A garage conversion lands between $120,000 and $220,000. A JADU, as noted above, runs $85,000 to $150,000. Site work is the wildcard: a flat lot on compacted native soil might need only $15,000 in grading and utilities, while a hillside-adjacent lot with expansive fill and retaining work could add $60,000 or more. Our written quote separates structure from site work so you see exactly what you’re paying for. Call (472) 248-8213 for a free estimate, and we’ll scope the number honestly against your lot, not a national average.

We Also Serve Cities Near Sherman Oaks

Our crews handle ADU projects across the surrounding San Fernando Valley, including Van Nuys, Encino, Studio City, and Tarzana. If you’re just over the city line from Sherman Oaks, the same Threshold Standard applies: written pricing, photo-badged technicians, and a 365-Day Done Right Promise. ADU Builders in Sherman Oaks know these neighboring streets well.

Serving Sherman Oaks, CA - Our Local Coverage Area

We’re based in the Sherman Oaks area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU Builders in Sherman Oaks

Why Sherman Oaks Chooses Sutton ADU Builders

We set the standard for adu builders in Sherman Oaks.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sherman Oaks

Getting your adu builders handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu builders needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Sherman Oaks - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu builders pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sherman Oaks Customers Say

Trusted by homeowners across Sherman Oaks and surrounding areas.

★★★★★

"Every crew member was vetted and carried a badge, which matters when they are around your family for months. Tidy site every day."

Daniel F. · Verified customer
★★★★★

"Itemized estimate with allowances laid out. Final cost was within a hair of the quote."

Naomi R. · Verified customer
★★★★★

"Backyard ADU for my mother. The project manager showed ID and walked me through the permit steps, the foundation plan, and the schedule. Moved her in on time."

Margaret C. · Verified customer

More ADU services in Sherman Oaks

Every build below starts the same way: a free site visit and a written price.

Getting started with Sutton

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Included

Written Guarantee on Every Repair

Expires Mar 31, 2027
Free

Free Second Visit if the Repair Fails

Expires Mar 31, 2027

Ready for ADU Builders in Sherman Oaks?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Sherman Oaks.

(472) 248-8213

Request a Free Estimate in Sherman Oaks

Tell us about your adu builders needs - we'll respond within the hour.

When you submit this form, you agree to the terms of our Privacy Policy and agree to be contacted via phone, email, or SMS about your request, including by the independent contractors we may refer it to.

Prefer to text? Text Us
Areas We Serve
Call Now - 24/7 Dispatch