A new modern detached ADU in a backyard
ADU Builders · Studio City, CA

ADU Builders in Studio City - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

282+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee
Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansProudly serving local communities 20+ years
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
A single-story rear room addition with tall windows and a new patio
A new sunroom addition with three walls of windows
A second-story addition that matches the existing roofline
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Builders Across Studio City

Studio City homeowners who add a detached ADU, garage conversion, or room addition are usually looking at a $180,000 to $320,000 investment before site work, which is exactly why you want a builder who scopes the job correctly the first time. We know the difference between a flat lot off Ventura Boulevard and a hillside site above Fryman Road, and we price accordingly. If you’re planning an ADU in Studio City, call (472) 248-8213 for a written, line-item price before any work begins. Miles Hartwell and our team coordinate Studio City scheduling from our Los Angeles office, with crews who know these streets.

Call (472) 248-8213

Why Sutton ADU Builders Is Studio City’s Preferred ADU Builders Company

A new modern ADU with wood cladding

Sutton ADU Builders approaches every Studio City project the same way: a written price delivered before we lift a single tool, a named crew you can verify before they arrive, and a 365-Day Done Right Promise that covers workmanship for a full calendar year. That matters on hillside lots where foundation decisions ripple through the entire build. Our ADU Builders team has scoped enough Studio City projects to know that the real cost drivers here are grading, drainage, and access, not the square footage alone.

We’re part of the Threshold Group family, founded in 2006, and every project runs under the Threshold Standard. That means background-checked, identity-verified, photo-badged technicians whose name and photo are sent to you before arrival. For homeowners working with a Home Addition Contractor in Studio City who are often home alone, have young kids, or simply want to know exactly who’s walking onto the property, that’s not a marketing line. It’s how we operate. You’ll see the same face on the badge and the name on the estimate.

Our reputation in Studio City is built on the projects that didn’t turn into change-order fights. We quote the site work up front, explain what LADBS will require during plan check, and tell you if your lot actually needs a soils report before you’ve spent a dollar on design.

ADU Contractor in Studio City

An ADU contractor in Studio City does more than frame walls and pull wire. The job starts with a realistic site assessment: slope, access for equipment, utility placement, and what LADBS hillside grading conditions will apply. On a flat lot near Coldwater Canyon, a standard slab-on-grade foundation might be fine. On a hillside pocket off Woodbridge Street, you’ll likely need a pier-and-grade-beam foundation, a soils report, and drainage details that get reviewed before the permit is issued.

Foundation and Site Work

This is where Studio City bids go wrong. A contractor who sizes your project off a flat-lot template will quote a number that looks great in the estimate and falls apart the week excavation starts. We scope the actual slope first. If your rear lot drops 14 feet across the footprint, we budget for piers, grade beams, and retaining work from day one, not as a surprise line item.

Permit and Inspection Sequence

Studio City falls under LADBS jurisdiction, and hillside ADUs trigger additional grading and drainage review. We handle the permit drawings, the plan-check revisions, and the inspection scheduling so you’re not decoding department notes at midnight. A realistic Studio City ADU permit calendar runs several weeks longer on slope than on flat ground, and we build that into the timeline rather than promising a date we can’t keep.

ADU Design in Studio City

A compact kitchen inside a new ADU

ADU design in Studio City has to answer two questions at once: what does LADBS need to see, and what will actually work on your specific lot. A detached 600 sq ft ADU off Fryman Road with a 12-plus-foot grade change needs a different foundation plan, drainage strategy, and sometimes a different roofline than the same unit would on a level lot in Sherman Oaks. Our Studio City design process starts with the site, not the catalog.

Matching the Existing House

Many Studio City homes are mid-century ranch or hillside contemporaries with specific siding, trim, and window patterns. We use James Hardie exterior systems and other cladding options to make the new ADU read as part of the property, not a foreign object dropped in the backyard. That matters for both resale value and the LADBS design review on visible hillside elevations.

Prefab and Site-Built Options

We design for both. A factory-built unit from Cover or Boxabl can shorten framing time, but the Studio City site work, crane access, utility trenching, and retaining walls are still real costs that need their own line in the budget. We’ll show you both numbers so you can compare honestly.

Trusted Brands We Service in Studio City

We have hands-on experience with Cover, Dvele, Mighty Buildings, and Boxabl, along with Tuff Shed conversions and James Hardie cladding. That means we can speak plainly about which product line fits a hillside Studio City lot, which ones need crane access planning, and what the factory quote does and does not include. We don’t pitch a brand because it’s popular. We pitch the one that works on your street, with your slope and your setback requirements.

Common ADU Builders Problems We See in Studio City Homes

  • Flat-lot scoping on a hillside site. A bid that skips the soils report and pier-and-grade-beam foundation comes in low and then swells the week excavation starts. We see this constantly on Woodbridge Street and Fryman Road lots where the grade hides the real structural requirement.
  • LADBS hillside grading conditions surfacing mid-plan-check. Drainage and slope-stability findings get added after the deposit is taken, which pushes the permit calendar out weeks and forces a foundation redesign. We price those conditions up front.
  • Prefab quotes with no site work. A factory turnkey number for an Abodu or Boxabl unit never includes crane access, retaining walls, or utility trenching through Studio City soil. That’s where the overrun lives, and it’s the difference between an honest bid and a sticker price.
  • Access problems that stall the build. Narrow hillside streets and tight rear-lot access in Studio City can limit equipment size. We plan for that before demolition day so the crew isn’t stuck waiting on a smaller machine that was never budgeted.

Pricing for ADU Builders in Studio City, CA

A detached ADU in Studio City runs roughly $280 to $420 per square foot for site-built construction, with the final number shaped heavily by slope, access, and LADBS conditions. A 600 sq ft unit on a flat lot falls around $180,000 to $260,000. The same unit on a hillside with pier-and-grade-beam foundation work runs $240,000 to $340,000. Prefab units from Boxabl or Cover often land between $150,000 and $280,000 for the structure, but Studio City site work, crane access, grading, and utility trenching add $30,000 to $90,000 on top. Garage conversions on level lots are typically $85,000 to $160,000. Every estimate from Sutton ADU Builders is a written, line-item price delivered before work starts, so you know exactly what you’re paying for. Call (472) 248-8213 for a free estimate on your Studio City ADU.

We Also Serve Cities Near Studio City

Our ADU Builders in Studio City team covers the surrounding area as well. We serve homeowners in North Hollywood, Van Nuys, West Hollywood, and Sherman Oaks with the same written pricing, Threshold Verified crews, and 365-Day Done Right Promise. If your property sits within a few miles of Studio City, call us at (472) 248-8213 and we’ll tell you honestly whether we’re the right fit for your lot.

Serving Studio City, CA - Our Local Coverage Area

We’re based in the Studio City area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU Builders in Studio City

Why Studio City Chooses Sutton ADU Builders

We set the standard for adu builders in Studio City.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Studio City

Getting your adu builders handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu builders needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Studio City - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu builders pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Studio City Customers Say

Trusted by homeowners across Studio City and surrounding areas.

★★★★★

"Every crew member was vetted and carried a badge, which matters when they are around your family for months. Tidy site every day."

Daniel F. · Verified customer
★★★★★

"Itemized estimate with allowances laid out. Final cost was within a hair of the quote."

Naomi R. · Verified customer
★★★★★

"Backyard ADU for my mother. The project manager showed ID and walked me through the permit steps, the foundation plan, and the schedule. Moved her in on time."

Margaret C. · Verified customer

More ADU services in Studio City

Every build below starts the same way: a free site visit and a written price.

Getting started with Sutton

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Included

Written Guarantee on Every Repair

Expires Mar 31, 2027
Free

Free Second Visit if the Repair Fails

Expires Mar 31, 2027

Ready for ADU Builders in Studio City?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Studio City.

(472) 248-8213

Request a Free Estimate in Studio City

Tell us about your adu builders needs - we'll respond within the hour.

When you submit this form, you agree to the terms of our Privacy Policy and agree to be contacted via phone, email, or SMS about your request, including by the independent contractors we may refer it to.

Prefer to text? Text Us
Areas We Serve
Call Now - 24/7 Dispatch